All Issue

2019 Vol.35, Issue 12 Preview Page

Research Article

31 December 2019. pp. 35-44
Abstract
References
1
Artes, J., Wadel, G., and Marti, N (2017), "Vertical Extension and Improving of Existing Buildings", The Open Construction and Building Technology Journal, pp.83-94.
10.2174/1874836801711010083
2
Cho, H. (2019), A Study on the Axial Stiffness and Load Distribution Ratio on Existing and Reinforcing Piles in Vertical Apartment Extension, Master thesis, Yonsei University, Seoul, Korea.
3
Choi, C.H., Lee, H.J., Choi, K.S., You, Y.C., and Kim, J.Y. (2017), "A Study of Prestressed Concrete Pile Stiffness for Structural Analysis of Condominium Remodeling with Vertical Story Extension", Journal of the Korean Geotechnical Society, Vol.33, No.12, pp.81-92.
4
Das, B. M. (2015), Principles of Foundation Engineering, Cengage learning.
5
Jang, Y., Wang, S., Han, J., Park, K., and Pyun, M. (2016), "Development of Optimal Reinforcement Foundation Method for Vertical Extension Remodeling, Proceedings of KSEG Spring Conference, pp.119-120.
6
Jeong, S.S. (2015), YSPR User's manual.
7
Jeong, S.S. and Cho, H. C. (2019), "A Study on the Load Distribution Ratio and Axial Stiffness on Existing and Reinforcing Pile in Vertical Extension Remodeling", Journal of the Korean Geotechnical Society, Vol.35, No.1, pp.17-30.
8
Jeong, S. S. and Kim, D. H. (2018), "Estimation of the Load Sharing Ratio of Pre-installed Columns in Top-down Buildings on Korean Rock", KSCE Journal of Civil Engineering, Vol.22, No.12, pp.4852-4861.
10.1007/s12205-017-1102-z
9
Jeong, S.S., Lee, J.H., Park, J.J., Roh, Y.H., and Hong, M.H. (2017), "Analysis of Load Sharing Ratio of Piled Raft Foundation by Field Measurement", Journal of the Korean Geotechnical Society, Vol.33, No.8, pp.41-52.
10
KICT (2013), "Development of Pre-loading Method for Reinforcement Piles of Apartment Remodeling (I)", KICT2013-260, KICT, pp.23-26.
11
Kim, D. H. (2018), Proposed shaft resistance of prebored precast pile using field loading test, Doctoral dissertation, Yonsei University, Seoul, Korea.
12
Kim, D. H., Jeong, S. S., Jung, G. J., and Park, J. J. (2018), "Load Sharing Ratio of Prebored and Precast Pile in Top-down Method Construction Process", Structural Design of Tall and Special Buildings, 27, pp.1-14 (doi: 10.1002/tal.1472).
10.1002/tal.1472
13
Kim, D. H. and Jeong, S. S. (2019), "Comparative Study of Load Distribution Ratio of Various Piled raft Foundations based on Coupled Stiffness Matrix", Structural Design of Tall and Special Buildings,
10.1002/tal.1669.
14
Kim, D. H., Kim, J. H., and Jeong, S. S. (2019), "Estimation of Axial Stiffness on Existing and Reinforcing Piles in Vertical Extension Remodeled Buildings", Engineering Structures,
10.1016/J.engstruct.2019.109466.
15
MOLIT (2013), Housing Act, Korea Ministry of Land, Infrastructureand Transport, p.2.
16
PLAXIS, B. V. (2005), PLAXIS User's manual.
17
Randolph, M. F. and Wroth, C.P. (1978), "Analysis of Deformation of Vertically Loaded Piles", Journal of Geotechnical Engineering Division of ASCE, Vol.104, No.12, pp.1465-1488.
Information
  • Publisher :The Korean Geotechnical Society
  • Publisher(Ko) :한국지반공학회
  • Journal Title :Journal of the Korean Geotechnical Society
  • Journal Title(Ko) :한국지반공학회 논문집
  • Volume : 35
  • No :12
  • Pages :35-44
  • Received Date : 2019-08-19
  • Revised Date : 2019-11-06
  • Accepted Date : 2019-11-07